critical path

critical path
The sequence of dependent steps that determine the minimum time needed to carry out an operation.

Wikipedia foundation.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Critical Path — may refer to: The Critical Path, the longest necessary path through a network of activities when respecting their interdependencies, which may be identified with the Program Evaluation and Review Technique and the Critical path method Critical… …   Wikipedia

  • critical path — n a way of planning and organizing a large piece of work so that there will be few delays and the cost will be as low as possible ▪ Costs can be calculated once the critical path has been established …   Dictionary of contemporary English

  • critical path — A sequence of those tasks ( e.g., in payment processing) which must be completed before the next task can be started. Anything not on the critical path is something that can be done later without delaying an important step. American Banker… …   Financial and business terms

  • critical path — UK / US noun [countable, usually singular] Word forms critical path : singular critical path plural critical paths the order in which a series of operations should be done so that a project can be finished as quickly as possible and for the… …   English dictionary

  • critical path — noun : a path (as in PERT) that connects the tasks in a process which are required to be completed for subsequent work to start or which take the greatest amount of time for completion and that provides an estimate of the duration of the entire… …   Useful english dictionary

  • Critical path — Die Methode des kritischen Pfades (auch Tätigkeits Pfeil Darstellung genannt; englisch critical path method, CPM) repräsentiert die Vorgangpfeil Netzpläne, als eine spezielle Netzplantechnik. Sie wurde 1956/57 vom amerikanischen Chemiekonzern… …   Deutsch Wikipedia

  • Critical Path Institute — (C Path) is an independent, non profit organization committed to transformational improvement of the drug development process. An international leader in forming collaborations around this mission, C Path has established first of its kind, global …   Wikipedia

  • Critical Path (book) — Critical Path   1st edition …   Wikipedia

  • Critical Path (video game) — Critical Path Developer(s) Mechadeus Publisher(s) Media Vision Technology Platform(s) Windows 3.x, Macintosh Rel …   Wikipedia

  • Critical Path, Inc. — Critical Path, Inc. Type Privately held company Industry Software Founded 1997 Headquarters Dublin, Ireland …   Wikipedia

  • critical path method — ˌcritical ˈpath ˌmethod noun [countable, uncountable] another word for critical path analysis * * * critical path method UK US noun [C or U] (ABBREVIATION CPM, also critical path analysis, ABBREVIATION …   Financial and business terms

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”